2023

E-Wood, Belgium – Assembly of a fluidized bed boiler for thermal conversion of biomass energy, including piping installation.
BP Scholven, Germany – Comprehensive installation of four gas-fired boilers.
Romonta DK7, Germany – Assembly of a boiler for thermal conversion of municipal waste, including components – horizontal flue gas path boiler.
SW Bonn, Germany – Installation of a new heat recovery boiler, including piping, flue gas ducts, and steel structure of the boiler house.
Heilbronn, Germany – Installation of a new water-tube drum boiler for heat recovery from biomass combustion.
Flensburg, Germany – Installation of a heat recovery boiler including thermal insulation and steel structure.
K+S Hattorf, Germany – Boiler modernization works.
Marl, Germany – Maintenance and commissioning works at a chemical complex, including replacement of boiler burners, process piping, and ongoing repairs of operating installations.
Cologne Merkenich, Germany – Dismantling and installation of the pressure part of a heat recovery boiler, including ducts, components, and connecting pipelines.
SW Augsburg, Germany – Replacement of the furnace installation of an existing heat recovery boiler, including a new fan, flue gas ducts, four new gas burners, reconstruction of gas pipelines, and partial boiler equipment.
Wiesbaden, Germany – Installation of two gas and heat recovery boilers.
Production of discharge electrodes.

 

2024

Aschaffenburg, Germany – Installation of a thermal treatment system for alternative fuels in a fluidized bed steam boiler, including pipelines and flue gas cleaning system.
Bremerhaven, Germany – Complete replacement of the pressure part of a heat recovery boiler, including piping, as well as replacement of air ducts and components.
Cologne Merkenich, Germany – Installation of the pressure part of a heat recovery boiler, including ducts, components, connecting pipelines, and service works.
Sète, France – Installation of the pressure part of a heat recovery boiler, including its piping.
Oldhall, United Kingdom – Installation of a municipal waste thermal conversion boiler, including piping, ducts, fuel feeding systems, and deslagging systems.
Riverside, United Kingdom – Installation of a municipal waste thermal conversion boiler, including piping.
Ravenna, Italy – Replacement of boiler membrane walls and modernization of secondary air ducts.
Spremberg, Germany – Installation of a municipal waste thermal conversion boiler, including piping, ducts, fuel feeding systems, and deslagging systems.
Scholven, Germany – Additional works during the comprehensive installation of four gas-fired boilers.
E-Wood, Belgium – Additional works during the installation of a fluidized bed boiler for biomass energy conversion, including piping.
Production of discharge electrodes.

 

2025

Rybnik, Poland – Comprehensive mechanical installation of process pipelines, including system supports and secondary steel structures.
Oldhall, United Kingdom – Installation of a municipal waste thermal conversion boiler, including piping, ducts, fuel feeding systems, and deslagging systems.
Zürich, Switzerland – Installation of steel structures and a municipal waste thermal conversion boiler, including piping, ducts, fuel feeding systems, and deslagging systems. Installation of an electrostatic precipitator.
Riverside, United Kingdom – Installation of a municipal waste thermal conversion boiler, including piping.
Gothenburg, Sweden – Delivery, prefabrication, and installation of process pipelines.
Stockholm, Sweden – Boiler service works.
Spremberg, Germany – Installation of a municipal waste thermal conversion boiler, including piping, ducts, fuel feeding systems, and deslagging systems.
Cologne Merkenich, Germany – Additional works during the installation of the pressure part of a heat recovery boiler, including ducts, components, connecting pipelines, and service works.
Sanem, Luxembourg – Boiler service works: replacement of superheater coils 1A and 1B, including headers and connecting pipelines.
Production of discharge electrodes.